Lynn D. Schroer 69
Oleeta Road, Mount Sinai, NY 11766 (631) 828-6249 Work No. (516)
346-7370 Email:
schroer69@hotmail.com Objective:
A responsible position in Scheduling / Planning ·
Extensive experience in scheduling applications spreadsheet, word
processing and database software programming · Excellent leadership, communication
and interpersonal skills geared for team environment · Exceptional organizational skills EXPERIENCE: Program
Scheduler / Planner
9/2008 to Present Exelis CORP, North
Amityville,
N.Y
. ·
Develop and prepare program
Integrated Master Schedules (IMS) for CH-53K program ·
Maintain and analyze Integrated
Master Plan and (IMP) for CH-53K program · Review Functional Inputs to ensure
quality and load data to Enterprise system to provide monthly earned value
status. · Monthly IMS submittals to primary
customer · Critical path analysis - Driving
Paths and Top Critical Paths · Metric reports for both Cost and
Schedule to alert Management and Functional Organizations pointing out
project changes · Provide Cost/Schedule Metrics for
Use in Monthly PMR’s · Develop MS Project Filters to
support Specific Project / Customer requirements. · Developed a process to upload
Operations Status into Enterprise System · Established an Automated process to
input Project Resources into Enterprise System · Risk Analysis reports (SRA)
developed to support Customer Requirements · Assigned to multiple Proposals to
assist with IMP/IMS requirements. Program
Scheduler
6/2003 to 9/2008 NORTHROP / GRUMMAN,
CORP, Bethpage,
N.Y
. ·
Develop and prepare program
Integrated Master Schedules (IMS) ·
Maintain and analyze key milestones
leading to major events (IMP) - See above · Monthly earned value status. · Risk Analysis reports (SRA)
developed for NAVAIR · Monthly metrics prepared to ensure
an integrated schedule · Integrate sub-contractor schedules
with the use of Microsoft Project Master
Scheduler
7/99 to 6/2003 ISLANDAIRE,
Ronkonkoma,
N.Y
. ·
Coordinate all scheduling and
planning operations. · Extensive computer usage for various
software programs. ·
Interface with purchasing dept. to
expedite material deadlines. ·
Investigate lead-times to ensure
proper scheduling of material. ·
Extensive usage of MRP Property
Management - Tooling Disposition
7/96 to 7/99 NORTHROP / GRUMMAN,
CORP, Bethpage,
N.Y
. ·
Coordinate all tooling
dispositioning for all major programs. · Extensive computer usage for various
software programs to assist in proper decision making. ·
Reporting directly to Supervisor for
generating various reports . Manufacturing
Engineering - Tooling Control & Cost Analysis
12/94 to 7/96 SYMBOL TECHNOLOGIES,
INC., Bohemia,
NY
· Coordinate processing of all
prototypes and first run designs within the manufacturing department. · Track and report on the engineering
& tooling purchases required for prototype manufacture. · Redefined and documented retooling
& purchase order process. The more efficient process caught numerous
purchase error savings. · Designed, developed and implemented
the database system to track tooling designs and purchasing information
totaling over $1.5 million dollars. Senior
Scheduling & Planning Analyst
9/78 to 11/94 Grumman - Aircraft
Systems Division, Bethpage, NY
· Routed all production workload and
cost estimate reports for the Aircraft Systems Division. · Coordinated information flow of 8
departments to produce long & short-range production forecasts. · Trained in groundbreaking
manufacturing database program called “Capacity & Planning Computerized
System (CAPOSS). · Tied information between
Manufacturing, Planning & Budget departments to produce work schedules
and cost estimate reports. Senior Release
Analyst
3/74 to 9/78 · Tracked and posted daily work orders
and “On-time to Production” schedules for aircraft totaling up to 15 per
month valued at over $150 million dollars. · Responsible for “Priority” and
“Dwell” reports detailing production status to senior management. TRAINING: Experience teaching (on an as needed basis) the
following computer software: ·
MRP (Visual Manufacturing) ·
Primavera P6 1Yr. Usage ·
Microsoft Access 2010 – 15+ Yrs. Usage ·
Microsoft Word 2010 – 15+ Yrs. Usage ·
Microsoft Excel 2010 – 15+ Yrs. Usage ·
Microsoft Project 2007 – 15+ Yrs.
Usage ·
Microsoft Power Point ·
Schedule Risk Analysis (SRA) ·
Earned Value Management – Basic Training Personal
& professional references furnished upon request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
|